    大學英語六級閱讀理解練習題

    時間:2021-01-25 12:31:17 英語六級

    大學英語六級閱讀理解練習題

      閱讀理解能力是衡量外語水平的.重要標志之一,對絕大多數學生來說,閱讀理解,也是他們將來直接運用外語能力的一個最重要的方面。小編整理了相關的內容,歡迎欣賞與借鑒。

    大學英語六級閱讀理解練習題

      In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (標準件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

      There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

      After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

      After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

      In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

      1. The main difference between panel method and the method discussed in the last paragraph is_______.

      A. the latter uses ready-made internal features

      B. panels are cast in a level position

      C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

      D. the former is more expensive than the latter

      2. Which of these statements is TRUE of system building?

      A. It employs more men. B. It is difficult and dangerous.

      C. It can save both time and money. D. It means less mechanization.

      3. According to the passage, the principle of system building is that_______.

      A. construction methods are safer

      B. buildings are made from a set of standardized units

      C. similar buildings can be produced

      D. all units are produced on the site

      4. The usual fixed length in the modular system is_______.

      A. twenty centimeters B. ten millimeters

      C. fifty centimeters D. ten centimeters

      5. What lifts the concrete panels onto the building?

      A. Cranes. B. Man-power.

      C. Pulleys. D. Hydraulic jacks.

      參考答案: 1. A 2. C 3. B 4. D 5. A

    【大學英語六級閱讀理解練習題】相關文章:

    大學英語六級閱讀理解完形填空練習題02-02

    大學英語六級閱讀理解練習題帶答案201702-03

    大學英語六級閱讀理解摸底練習題及答案02-03

    2017年大學英語六級閱讀理解練習題02-03

    2017年大學英語六級閱讀理解精選練習題02-03

    英語閱讀理解練習題02-23

    英語六級考試閱讀理解綜合輔導練習題02-03

    大學英語六級考試閱讀理解例題輔導02-03

    大學英語六級閱讀理解綜合考點訓練02-03

    大學英語六級閱讀理解考前訓練題02-03

    主站蜘蛛池模板: 人妻体内射精一区二区| 美女高潮无套内谢视频免费| 美女又色又爽视频免费| 不卡一区二区国产在线| 亚洲中文字幕AV| 99re在线视频播放| 日韩精品视频在线观看免费 | 国产高潮流白浆喷水免费网站| 亚洲成av人在线播放无码| 精品国产高清中文字幕| 中国成人XXXX高清视频| 国产激情精品一区二区三区| 国产福利导航在线| 国产91色在线| 新国产三级视频在线播放 | 久久国国产免费999| 国产美女自卫慰黄网站| 51国产黑色丝袜高跟鞋| 丝袜精品字幕| 亚洲不卡的av| 国内精品视频一区二区三区 | 亚洲国产天堂久久综合| 影音先锋一区| 亚洲国产成人无码av在线影院 | 最新最近中文字幕亚洲| 国产99视频精品免费视看9| 国产高清精品在线一区二区| 中文字幕一区二区三区又粗| 精品人妻系列无码专区| 日本午夜网站| 国产成人77亚洲精品www| 国产粗话肉麻对白在线播放| 国产激情AV小说| 无码国产色欲xxxx视频| 又粗又大网站| 国产熟人av一二三区| 国产99视频精品免费视看6| 最新91精品国产手机| 亚洲精品理论电影在线观看| 无码A级毛片免费视频下载| 青青草免费公开视频|